Plots 1 & 2 Bull Hill

On Going Development of Two Residential Properties

Location: Plots 1 & 2, Bull Hill, Osgathorpe

Contract Duration: September 2024 - On going

Project Overview

This project involved the complete transformation of a derelict rural site into two high-specification, energy-efficient detached family homes in the heart of Leicestershire. RJH Building Construction were appointed as principal contractor to deliver a full demolition, ground-up build, and detailed architectural execution. The scheme reflects a blend of traditional village character and modern building performance, enhancing the local streetscape while exceeding national energy standards.


Key Highlights

  • From Derelict to Desirable
    The site previously housed a deteriorated Victorian cottage surrounded by dense overgrowth and failing structures. It was fully cleared and redeveloped into two detached homes with detached garages.

  • Energy-Efficient Design
    Both plots exceed regulations, achieving targeted SAP ratings, with Environmental Ratings of A.

  • Traditional Aesthetic, Modern Performance
    Homes feature red brickwork, natural stone plinth detailing, dormer windows, vaulted ceilings, and hand-built chimneys—all paired with ASHP heating and underfloor systems.

  • Craftsmanship and Detailing
    The brickwork, reclaimed timber fireplace, and bespoke joinery reflect RJH’s dedication to quality and heritage-consistent finishes.

  • Challenging Ground Conditions
    Early groundwork phases required adaptive excavation and drainage solutions due to poor winter weather and legacy rubble foundations.

  • Sustainability in Practice
    Installed air source heat pumps, full Celotex insulation systems, low-permeability membranes, and mechanical ventilation preparation.


Design & Construction Process

The project followed a clear phased timeline, overseen by RJH in close collaboration with architectural and engineering consultants:

  • Pre-Construction (Q2 2024):  Full site clearance, asbestos removal, service disconnection, ecology checks.
  • Groundworks (Q4 2024):  Trench foundations, drainage runs, site prep under challenging winter conditions.
  • Superstructure (Late Q4 2024):  Blockwork, stone and brick façade, steel and posi-joist first floor system.
  • Roofing (Q1 2025):  Trussed roof installation, dormers, tiling, chimney and flue works.
  • First Fix (Q2-Q3 2025):  Mechanical and electrical, UFH, partition walls, internal rendering
  • Second Fix(Q3 2025-Ongoing): Finishes, joinery, landscaping, SAP verification, final test certifications.

Technologies & Innovations:

  • Posi-joists for service-friendly floor zones

  • Vaulted ceiling steel ridge beams

  • SAP-verified thermal bridge detailing

  • Airtightness strategies to meet Part L & EPC targets

  • Timber and steel fusion construction for structural integrity


Project Details

Client: Foxes Property Ltd

Contractor: RJH Building Construction

Architect: Making Plans Architecture

Structural Engineer: Bayliss Consulting

Site Area: Approx. 300m² per plot

Build Area: Approx.1,000m² per house


Awards or Recognition

To be submitted for consideration under the East Midlands LABC Building Excellence Awards 2025, under the category "Best New Small Housing Development."

Back To List
Image 1 Of Plots 1 & 2 Bull Hill Image 2 Of Plots 1 & 2 Bull Hill
Nhbc
Nhbc
Nhbc

Contact RJH Building Construction Ltd

01530 834 040

Find Us On Facebook

Send Us A Message

* * *
*
Cookies

This website uses cookies. Please let us know if you agree to the use of these cookies :
I Accept I Decline

Privacy Policy | 3rd Party Data Processors | Disable Cookies
Cookies